Prudent CAPEX
Key investment projects
Steelmaking
Blast furnace No. 7 construction at EVRAZ NTMK
The project aim is to maintain stable pig iron production volumes during the capital repair of blast furnace No. 6 in 2018-19.
StatusSuccessfully launched.
Grinding ball mill construction at EVRAZ NTMK
The project aim is to construct a new grinding ball mill that can make the grinding balls of hardness category five.
StatusSuccessfully launched.
Wheel resurfacing capacity expansion at EVRAZ NTMK
The project aim is to expand wheel resurfacing capacity to balance production capacity in 2019-22 and increase production volumes.
StatusSuccessfully launched.
Mining
The Tashtagolskaya mine development at Evrazruda
The project aim is to increase the Tashtagolskaya mine production capacity to 3.25 Mtpa with partial switching to sublevel caving and using of mobile equipment.
StatusPerformed surveying, developed mining equipment upgrading projects, completed first stage of mine development for sublevel caving mining.
The Sobstvenno-Kachkanarsky deposit greenfield project at EVRAZ KGOK
The project aim is to support EVRAZ KGOK’s mining capacity at the level of 59 Mtpa through access and development of a titanium magnetite ore deposit.
StatusDeveloping detailed design for infrastructure facilities.
Key maintenance projects
Blast furnace No. 6 construction major overhaul at EVRAZ NTMK
The project aim is to reconstruct the 2.5 mtpa blast furnace 6.
StatusSelected the general designer and the main equipment suppliers.
Tailings facility extension at EVRAZ KGOK
The project aim is to build a thickener and a new damp to maintain processing capacities at the level of 59 Mt of ore a year.
StatusInstalled the hydro-compression system at the booster. Currently upgrading equipment at Electric Substation No. 17 and constructing Electric Substation No. 18.
Switching the Severny open pit to truck and rail mining at EVRAZ KGOK
The project aim is to increase ore extraction capacity to 30 Mtpa through using truck and rail mining in the Severny open pit with a possibility for further capacity growth. Part of sub-stage 2.3 in 2018.
StatusCompleted the final stage of the project, acquired two 130-tonne dump trucks.